Before shot of a duplex job we did. These stairs will be removed and a laundry closet will be built here.
The back door will remain as main entrance to lower unit.
original basement and cold storage room. To the right will be a bedroom and bathroom will be to the left. Existing plumbing that will be redone.
This will be the new kitchen. An Egress window will be added above the laundry sink.
another look at cold room. This is under the front porch.
inside cold room. Sloped area is the back of the stairs to front porch.
basement stairs to kitchen. They will be removed and wall will be extended to back door with a new floor in kitchen for laundry closet.
original basement stairs. In background can be seen the laundry area that will become new kitchen.
Kitchen window will be removed and a new back door and small deck will be added for second exit from main floor unit.
Original toilet and water meter in basement. This will be new washroom and meter will be moved and mounted properly in bedroom closet.
Where water line came into house. Not a proper job done by previous owner. This is where the new meter will be relocated and will be a bedroom.
New water meter has been installed in bedroom 3. It is inside the closet. All windows were also replaced.
Bathroom is drywalled and painted. The upper unit has been rented so this was our washroom.
Former cold room is now a den. You can see the angle from the back of the stairs going to the front porch.
Bedroom 1. Window was replaced with a new window.
The kitchen is getting flooring installed. The new egress window can be seen here. We had to dig out for a window well then cut the foundation wall for the egress window.
Another angle of the kitchen. The original stairs are still there, they will be redone last.
looking from kitchen into the main room of the unit. Laundry closet can be seen just to the left, coat closet is behind by the bench. Existing window has been replaced.
Kitchen cupboards are being installed.
Kitchen cabinets have been installed. There is paper on the floor which is why it looks a different colour.
different angle of new kitchen
Countertop has been installed and the appliances are in place. Egress window has been trimmed. The bare drywall is all getting tiled.
You can see the new wall we added in the kitchen when we removed the old basement stairs.
Ceramic tile is installed around tub in basement bathroom.
The tub did not go full length of the bathroom so we built a linen cupboard in it.
Sink and toilet are behind me.
The old stairs before we installed new treads and risers and handrails.
You can see the tile backsplash in the kitchen next to egress window.
Work begins on the stairs.
side view of stairs from kitchen. You can see the laundry units in the laundry closet on the left.
Finished stairs. Look much nicer than the original did.
Looking from kitchen at the new stairs.
The yellow bulkhead was ordered by the building inspector since it was a low ceiling in the basement.
Inside the finished den /former cold room.
The door had to be cut down since it is smaller than any standard door.
In the den looking out.
standing in hallway looking at den door. Bedroom 1 is to the right.
looking into bedroom 1. The yellow bulkhead was ordered by building inspector due to low ceiling height.
Bedroom 1 closet. All bedroom have sliding doors installed.
Looking into bedroom 2
Closet in bedroom 2 and looking down hall towards bedroom 3.
Bedroom 2 looking out.
Bedroom 3. The water meter is in the closet.
Bedroom 3. The new window can be seen in this photo.
The original windows were original to the house and had storm windows and all wooden frames.
bedroom 3 looking towards door.
looking from bedroom 3 towards bedroom 2. Bathroom is to the left.
Finished bathroom. This where the original toilet and water meter were located in early pictures.
Another view of bathtub.
Vanity and toilet.
Finished linen closet we built.
looking from stairs into the main room of the unit. New window.
In main room looking back towards kitchen. Coat closet and laundry can be seen. Water heater and softener are in the closet behind the laundry.
The finished kitchen.
The kitchen and egress window. Furnace and electric panel are in a mechanical room behind fridge. Pocket door to mechanical room.
Small deck to new back door for upper unit.
New deck. We cut the wall out and installed a new back door for the upper unit.
Finished deck to allow access to back door to upper unit.
New deck to back door of upper unit.
Gate and small fence were installed between existing fence and house.
Fire rating above a ceiling in a garage that is being converted to an inlaw suite.
hallway between main house and new inlaw suite. This is a fire rated wall with sound batts for soundproofing.
Drywall is up now I have to build some bulkheads to cover up the duct work.
more duct work that needs to be covered.
Starting to frame the bulkheads. They will be running around the outside of the main room in the inlaw suite.
I prefer to frame with steel for bulkheads as it is both faster and straighter than using wood.
Bulkheads in master bedroom.
looking down hall toward front door. I had to drop a lower ceiling as we had to cover exhaust fan, dryer vent and air supply .
bullhead over back door.
dropping a ceiling in a closet to cover ductwork.
bulkhead in master bedroom.
The owner is handicapped so they wanted a handicap access shower. There is a tub in the other corner.
custom shower.
other side of the mechanical room where furnace is located.
Two lasers. I like having the different colours of lasers as I can level the bulkhead both ways at the same time.
bulkhead is now boarded
boarded bulkheads.
Back hall between the house and the new inlaw suite. This is all fire board since it is 2 attached units.
Taping begins in the den.
Photo
Taping in master bedroom.
looking towards ensuite washroom.
The main room of the unit.
in main room looking towards back door.
looking from main room to back door.
Back door with dropped ceiling to cover duct work.
Front entry area.
everything is getting coated.
den looking out to main room.
Ensuite washroom.
washroom
Custom shower. This area will have wall tiles over most of it with glass wall and open door for wheelchair access.
Photo
The stairs going into the basement had very low clearance. Being 6' I could not walk down straight up and had to lean to clear. We added more headroom by removing part of a floor joist. Bedroom in upper unit has box in it now.
looking from bedroom 2 towards bedroom 3. Washroom is on right, living room and kitchen is through arch to the left. The bearing wall in the basement split the space into two parts.
Photo
Photo
Photo
Photo
Photo
Photo