In the majority of the CAD systems the CAD and ERP system of manufacturer have continued to be separate, which requires anyone to by hand go into the engineering bills of fabric from CAD towards the ERP system. This wastes the time and effort from the engineers and it is disposed to human errors and confusion within the data.