Picture of a new valley installation.
Before picture of storm damage from a tree limb.
During a storm a tree limb had broken the wood on the corner of the house and created damage.
After picture of the work while still on-going. Facial overhang was repaired, bad wood replaced, and new shingles installed.
Removal and replacement of hail damaged siding.
Removal and replacement of hail damaged siding.
Removal and replacement of damaged siding.
New siding installed.
Owner called and stated that he had a persistent leak which several others had tried to unsuccessfully repair. We assessed the damage, gave quote and fixed it.
Lower section has been completed, upper section is now in progress.
Full replacement of rotten wood in valley.
Same process is repeated on the other side of valley.
Both layers of roof were removed and felt down to inspect the roof deck for rotten wood.
Old roof vents were removed and replaced with new 750 style slant back roof vents.
More pictures of two layer tear off along with felt to inspect the roof deck for rotten wood.
Finish picture after all the new shingles are installed on one of the valley sides of the house.
Installation of new shingles on hip side of house still needs ridge cap.
During the tear off process we found the saddle behind the chimney was completely rotten from water damage.
Picture of shingles installed on back of house and new vent that was cut in to allow more ventilation.
Completed installation of 30 yr 3 Dimensional shingles on hip side of house.
Finished project of a roof replacement.
Completed tear off and installation of new 30yr 3 Dimensional shingles.
Aged roof had out lived its life and new 30yr 3 Dimensional shingles were installed.
Before picture of the removal of hail damaged ridge cap that had split from hail impact and replacement of roof vents which were also damaged.
After picture where ridge cap and roof vents have been replaced.
As we work up the wall damaged siding is removed and new siding is installed.
All damaged siding has been removed new siding is almost complete on this wall.
Before picture of hail damaged siding
After picture where siding has been replaced.
Picture after damaged siding has been replaced.
After picture all siding on the damaged side of house has been removed and replaced.
Old 3-tab hail damaged shingles were removed and new 30yr 3-dimensional shingles were installed using the manufacture suggested stair step installation.
Removal of old hail damaged siding and installation of new double 4 siding to match existing.